Naval Submarine Rescue System

Tuesday, 07 December 2010 23:48 Written by  Administrator Read 22624 times
Published in Main Slide

The special valve built for the US navy to empty a tank used to test a submarine recovery system. Prior to installing the Newton Kwik Dump a 3” ball valve was used. The time to empty the tank went from over hours to less than 5 minutes.

The special valve built for the US navy to empty a tank used to test a submarine recovery system. Prior to installing the Newton Kwik Dump a 3” ball valve was used. The time to empty the tank went from over hours to less than 5 minutes.

Last modified on Friday, 13 May 2011 02:16

For over 65 years, A.H. Stock Manufacturing Corp. has been a builder and fabricator of metal products for a variety of industries. We manufacture various components for several OEM manufacturers throughout the United States that are involved in heavy lifting equipment, large tooling centers and fabricating equipment among others. Our mission is to provide our customers with a single source for their metal fabrication needs - from raw materials to finished assemblies - that meet or exceed their expectations.

A.H. Stock Manufacturing Corp. | 8402 Center Road Newton, WI 53063 | Phone: (920) 726-4211 | Fax: (920) 726-4214 | Email:sales@ahstockmfg.com

Website Design by Strategic Strategies Inc.